testwood water supply project

Testwood Water Supply Works

FLI Precast assisted in the precast run-to-waste & backwash tanks design and installation.

Challenge

Work collaboratively alongside other contractors to design and manufacture to specific deadlines throughout the project.

Approach

As always, FLI Precast’s approach was to help keep pipework penetrations to a minimum and ensure efficiency on-site.

Solution

Working with our partners we able to bring all major pipework above ground and therefore reducing the need for large ancillary chambers.

Project Overview

Testwood Water Supply Works (WSW) is a critical surface water supply works within the Southern Water region, supplying 91 Ml/d to around 200,000 customers in Hampshire and the Isle of Wight.

FLI Precast assisted in the precast run-to-waste & backwash tanks design and installation.

To optimize the volume available within the given footprint on-site, a rectangular shape was preferable and was, therefore, a good candidate for modular precast concrete wall sections.

FLI Precast Ltd was engaged via Trant, and design progressed collaboratively. Keeping pipework penetrations to a minimum, and making them simple and linear minimised the amount of work required on site.

Space for the backwash tank was constrained and needed to fit logically into the overall plant process stream, there was a challenge to arrange the pipework in a way to maintain good access to all maintainable parts.

The final design brought all major pipework above ground thus reducing the need for large ancillary chambers.

Project Details

Location: Hampshire

Client: Southern Water

Services: Precast run-to-waste & backwash tanks

Duration:  44 weeks

2020_testwood_capital2