Key Role in the Pioneering
Greenlink Interconnector Project

Wexford, Ireland.

Background

Powering Connections: FLI Precast Solutions' Key Role in the Pioneering Greenlink Interconnector Project

FLI Precast Solutions are delighted to play a key role in a groundbreaking international project.

The Greenlink Interconnector is a subsea and underground electricity interconnector cable linking the existing electricity grids in Ireland and Great Britain.

It has a nominal capacity of 500MW. Greenlink will provide a new grid connection between EirGrid’s Great Island substation in County Wexford (Ireland) and National Grid’s Pembroke substation in Pembrokeshire (Wales).

The power will be able to flow in either direction, depending on supply and demand in each country.

Greenlink has key strategic importance, as it will provide significant additional interconnection between Ireland and Great Britain, with onward connections to continental Europe.

The construction and development of Greenlink will deliver increased energy security, regional investment and value for money to consumers, and will enable the further integration of low carbon renewable energy sources.​

FLI Precast Solutions: Sculpting the Backbone of Greenlink

As part of this groundbreaking initiative, FLI Precast Solutions is immensely proud to have played a pivotal role, providing robust Cable Troughs and Chambers  integral to the seamless functioning and safety of the interconnector.

Greenlink will consist of two converter stations – one located close to the Great Island substation in County Wexford and the other close to the Pembroke substation in Pembrokeshire – connected by two High Voltage Direct Current (HVDC) cables under the Irish Sea.

FLI Precast played a key role on the works in both of these converter stations.

Our troughs and chambers were key in allowing this project to be completely below the ground. Onshore, the cables will be buried underground and offshore the cables will be buried in the seabed or laid on the seabed with protection, if burial is not practicable.

Our precast solutions, renowned for their durability and precision, were meticulously crafted to cater to the unique demands and rigorous standards of this monumental project.

Our involvement in Greenlink not only showcases our capabilities in contributing to high-profile infrastructure projects but also underscores our commitment to driving sustainable energy solutions across borders.

Project Benefits

The development of such a project will bring many long-lasting benefits. These include:

  • Potential to power 380,000 homes
  • Supports the growth and integration of low carbon energy
  • Enhances the security of supply for electricity consumers
  • Downward pressure on electricity bills
  • Jobs and knock-on economic benefits during construction & operation

Our Partners and Suppliers

Success, especially in a project of such magnitude and significance, is invariably the fruit of collective effort. Alongside our accomplished team at FLI Precast Solutions, the unyielding dedication and expertise of our partners and suppliers have been paramount in navigating the complexities of the Greenlink project

In an era where sustainability and connectivity are pivotal, we are excited about the future and the potential it holds for further innovative projects that bridge geographies and energies alike.

Here’s to more collaborations, innovations, and being a part of projects that light the path toward a sustainable, interconnected future!

You can learn more about this exciting project over at: https://www.greenlink.ie/

 

Engineer or Quantity Surveyor

Are you an engineer or quantity surveyor and would like to discuss details of a bespoke design?

National Body or Local Authority

Are you a National Body or Local Authority and would like to work alongside FLI Precast on a project?

General Enquiry

Perhaps you are familiar with some of the services FLI Precast provides but would like to organise a quotation?

Engineer or Quantity Surveyor

Are you an engineer or quantity surveyor and would like to discuss details of a bespoke design?

National Body or Local Authority

Are you a National Body or Local Authority and would like to work alongside FLI Precast on a project?

General Enquiry

Perhaps you are familiar with some of the services FLI Precast provides but would like to organise a quotation?

Get a Quotation

Name
Max. file size: 256 MB.
This field is for validation purposes and should be left unchanged.

We'd love to hear from you, so please get in touch

Scroll to Top