Howth Middle Pier
Upgrade

Project name: Howth Middle Pier  

Location: Dublin 

Duration: 5 Months 

Services provided: Design, Manufacture and Supply 

Product(s): Pier Walls – Inverted T and L walls 

Contract partners/client : John Sisk & Son 

Background Information/Project Overview

FLI Precast Solutions Ltd was contracted to Design, Manufacture, and Supply Precast Pier Walls for Howth Middle Pier. We were tasked with manufacturing it in a way that was simple for the divers to install. This was an extremely challenging installation; some of the walls were between 12 to 16 tonnes in weight. We worked closely with Sisk to come up with the most efficient way of fitting the walls under the water, while simultaneously meeting the specific design requirements in a marine situation 

Interactive Brochure

Please wait while flipbook is loading. For more related info, FAQs and issues please refer to DearFlip WordPress Flipbook Plugin Help documentation.

Engineer or Quantity Surveyor

Are you an engineer or quantity surveyor and would like to discuss details of a bespoke design?

National Body or Local Authority

Are you a National Body or Local Authority and would like to work alongside FLI Precast on a project?

General Enquiry

Perhaps you are familiar with some of the services FLI Precast provides but would like to organise a quotation?

Engineer or Quantity Surveyor

Are you an engineer or quantity surveyor and would like to discuss details of a bespoke design?

National Body or Local Authority

Are you a National Body or Local Authority and would like to work alongside FLI Precast on a project?

General Enquiry

Perhaps you are familiar with some of the services FLI Precast provides but would like to organise a quotation?

Get a Quotation

Name
Max. file size: 256 MB.
Consent(Required)

We'd love to hear from you, so please get in touch

Scroll to Top