FLI Precast played a key role in the construction of a multi-million-pound distribution reservoir service in Stoke.
Challenge
This project required a 43ML reservoir tank to be manufactured off-site in controlled conditions, before being assembled at its final location.
Approach
The team at FLI Precast had to lean on previous experience with large-scale projects and ensure all aspects could be designed off-site to an exact specification.
Solution
FLI Precast worked closely with its partners on this project and its completion means there will be a reliable water supply for many years to come.
Project Overview
FLI Precast played a key role in the construction of a multi-million-pound distribution reservoir service in Stoke.
With a large amount of the project being assembled off-site, FLI Precast were able to use their expertise from previous projects. A number of different companies worked alongside each other in collaborative planning sessions in the lead-up to the project.
Ensuring much of the project was assembled off-site also allowed a massive reduction in the length of the project.
Project Details
Location: Stoke
Main Contractor: Mott MacDonald Bentley
Services: Off-site design and manufacture of precast columns
Duration: 34 weeks