Hanchurch Service Reservoir (2018)

FLI Precast played a key role in the construction of a multi-million-pound distribution reservoir service in Stoke.

Challenge

This project required a 43ML reservoir tank to be manufactured off-site in controlled conditions, before being assembled at its final location.

Approach

The team at FLI Precast had to lean on previous experience with large-scale projects and ensure all aspects could be designed off-site to an exact specification.

Solution

FLI Precast worked closely with its partners on this project and its completion means there will be a reliable water supply for many years to come.

Project Overview

FLI Precast played a key role in the construction of a multi-million-pound distribution reservoir service in Stoke.

With a large amount of the project being assembled off-site, FLI Precast were able to use their expertise from previous projects.  A number of different companies worked alongside each other in collaborative planning sessions in the lead-up to the project.

Ensuring much of the project was assembled off-site also allowed a massive reduction in the length of the project.

Project Details

Location: Stoke

Main Contractor: Mott MacDonald Bentley

Services: Off-site design and manufacture of precast columns

Duration:  34 weeks